Verification unit for SGT ESD earthing test devices
The SafeGuard Verification Unit is a testing device used to verify the resistance values of the SGT Pro and SGT Pro Plus grounding test stations (WL74230 and WL74229) as well as the SafeGuard access control systems with integrated 3-arm turnstiles (WL83770 and WL83771).
By simply connecting the Verification Unit to the respective test station, the individual resistance values can be set using a rotary switch. The connected SGT test station must display either “PASS” or “FAIL” to confirm correct operation and compliance with the defined limit values.
The functionality of the built-in SGT Pro Plus test station can also be verified on SafeGuard access control systems with an integrated turnstile. This applies to both the right-hand version (WL83770) and the left-hand version (WL83771). Regular testing supports reliable monitoring of personal grounding and helps ensure that access to electrostatic-protected areas (EPA) is granted only after a successful grounding test.
By using the calibrated SafeGuard Verification Unit, the respective test station can be tested directly on-site. Once the test has been passed, the SGT test station is considered operational for another year. There is no need for time-consuming disassembly or shipping the test station in for calibration. This prevents downtime and ensures continuous verification of personal grounding before entry into the EPA.
The recommended calibration interval for the SafeGuard Verification Unit is 1 year.
Scope of delivery:
- Connection cables for SafeGuard SGT Pro / SGT Pro Plus
- 1x 1.0 m cable with 8-pin connector / 2x 4 mm banana plugs
- 2x 1.5 m connection cables (1x red / 1x black, max. current: 2 A)
- Manufacturer’s calibration certificate
- User manual
• Accuracy: 1%
• 2x 4 mm banana plugs for connection cable
• Maximum current: 2 A
• Dimensions: 50 x 50 x 96 mm (incl. rotary switch)
• Weight: 100 g
By simply connecting the Verification Unit to the respective test station, the individual resistance values can be set using a rotary switch. The connected SGT test station must display either “PASS” or “FAIL” to confirm correct operation and compliance with the defined limit values.
The functionality of the built-in SGT Pro Plus test station can also be verified on SafeGuard access control systems with an integrated turnstile. This applies to both the right-hand version (WL83770) and the left-hand version (WL83771). Regular testing supports reliable monitoring of personal grounding and helps ensure that access to electrostatic-protected areas (EPA) is granted only after a successful grounding test.
By using the calibrated SafeGuard Verification Unit, the respective test station can be tested directly on-site. Once the test has been passed, the SGT test station is considered operational for another year. There is no need for time-consuming disassembly or shipping the test station in for calibration. This prevents downtime and ensures continuous verification of personal grounding before entry into the EPA.
The recommended calibration interval for the SafeGuard Verification Unit is 1 year.
Scope of delivery:
- Connection cables for SafeGuard SGT Pro / SGT Pro Plus
- 1x 1.0 m cable with 8-pin connector / 2x 4 mm banana plugs
- 2x 1.5 m connection cables (1x red / 1x black, max. current: 2 A)
- Manufacturer’s calibration certificate
- User manual
• Accuracy: 1%
• 2x 4 mm banana plugs for connection cable
• Maximum current: 2 A
• Dimensions: 50 x 50 x 96 mm (incl. rotary switch)
• Weight: 100 g
| Item no. | WL83738 |
| Manufacturer | SAFEGUARD |
| Manufacturer article no. | SAFEGUARD-SGT-ERDUNGSPRÜFGERÄT |
| Length | 96 mm |
| Width | 50 mm |
| Height | 50 mm |
| Sales unit | 1 piece |
| Content unit | 1 piece |
| CE-certified | yes |
| Measurement accuracy | 1% |
| GPSR manufacturer data | Weidinger GmbH Hertha-Sponer-Str. 1a DE-82216 Gernlinden |